EasyManua.ls Logo

ABB AO2000 Series - Page 104

ABB AO2000 Series
362 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
104 AO2000 CONTINUOUS GAS ANALYZERS | OI/AO2000-EN REV. B
Connection of the sample gas line
1
Heated sample gas line (tube with inside/outside diameter 4/6 mm)
2
O-ring 6.02 x 2.62
3
Socket
4
O-ring 12.42 x 1.78
Connection of a further sample gas line (tube with outside diameter
6 mm):
either with
5
Male fitting G¼”
or with
6
Socket
7
Tapered ring
8
Compression fitting
Closure:
9
Screw cap
10
O-ring 12.42 x 1.78
11
Exhaust gas tube
Sample gas Connection of the sample gas line
inlets: on 19-inch housing: on wall-mount housing:
I from the rear from below
II from above from the right
III from below not possible – the sample gas inlet
must always be closed
Maximum length of the sample gas line
The maximum length of the heated sample gas line (inside diameter 4 mm)
is 60 m.
Provide for sample gas line purging
Install a shut-off valve in the sample gas line (definitely recommended with
pressurized sample gas), in order to provide a means for purging the gas
line system by feeding in an inert gas, e.g. nitrogen, from the gas sampling
point.

Table of Contents

Related product manuals