62 DPA 250 S4 50-250 KW OPERATING MANUAL
9.2.1 Battery cabinet location
In most cases the battery cabinet is positioned
alongside the UPS cabinet (unless the UPS cabi-
net requires side access) and takes advantage of
the seam clearances. The minimum needed clear-
ances of the battery cabinet depend on the de-
sign of the cabinet (especially the openings). As
VRLA batteries need natural ventilation, it is al-
ways recommended to keep a certain clear- ance
from the openings. How much that clearance
needs to be highly depends on installation, good
practice is to maintain a minimum of 100mm
clearance at the walls with opening.
9.2.2 Fixing of the UPS to the building
structure
WARNING
BE CAREFUL OF THE HEAVY WEIGHT OF
THE BATTERIES
To fix the unit to the floor use the hole on each
foot as shown on the drawing below. The quotes
are in inches and [mm].
The fixing elements must be chosen in relation
to the type of floor/support where the unit will
be fixed.
—
9.2.2-1: Fixing
of the UPS to the
building structure
—
9.2.2-1