7 Periodic maintenance work
7.1 Foreword to maintenance
Maintenance work includes regular visual controls and cleaning operations which are inten-
ded to ensure the trouble-free functioning of the turbocharger.
To allow you to observe the standard service intervals and to maintain a high turbocharger
efficiency, Turbo Systems recommends that the cleaning procedure be carried out during
operation. This allows the thermal load of the engine to be kept low while ensuring max-
imum fuel efficiency.
Maintenance inter-
val
Maintenance work Operating status
24… 72h
1)
Cleaning the compressor during operation
→65
Engine load 50…85%
50…200h
1)
Cleaning the turbine during operation →68 Engine load 20…40%
(guideline value)
According to rating
plate
2)
Cleaning components mechanically →72 Engine stopped
Table13: Maintenance table
[h] = Hours of operation
1)
If the maintenance intervals are incompatible with operation of the engine, contact Turbo
Systems.
2)
Turbo Systems recommends having mechanical cleaning carried out by a Turbo Systems
service station during the service work (see also chapter Service work according to data on
the rating plate →58). Otherwise, only carry out mechanical cleaning if cleaning during opera-
tion is not sufficient to achieve the thermal load and the rating of the engine.
Page 64 / 149