EasyManua.ls Logo

ABB PT003901 - Figures

ABB PT003901
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / Power2 340-H / High-pressure stage
Figures
© Copyright 2022 ABB. All rights reserved. HZTL4054_EN Revision F March 2022
Figures
Fig.1: Layout and function ............................................ 7
Fig.2: Layout of the high-pressure stage ................. 8
Fig.3: Function of the high-pressure stage.............. 9
Fig.4: Volatile Corrosion Inhibitor (VCI)................... 12
Fig.5: Package with hygrometer................................ 13
Fig.6
High-pressure stage
........................................... 18
Fig.7: Rating plate ........................................................ 19
Fig.8: Location of Power2 HP rating plate ............. 20
Fig.9: Attachment of loads on the crane hook ....... 21
Fig.10: Attachment angle............................................ 21
Fig.11: Swivel lifting eye (example) .......................... 30
Fig.12: Transport.......................................................... 30
Fig.13: Removing the high-pressure stage.............. 31
Fig.14: Loosening the clamping nut ......................... 32
Fig.15: Removing the high-pressure stage.............. 33
Fig.16: Gaskets in the slots of the bearing casing 34
Fig.17: Preparing the fastening elements of the
high-pressure stage..................................................... 35
Fig.18: Placing the high-pressure stage on the
bracket ........................................................................... 36
Fig.19: Steps for fastening the high-pressure stage .
37
Fig.20: Steps for fastening the high-pressure stage.
38
Fig.21: Preparing the clamping nut for the tighten-
ing procedure ............................................................... 39
Fig.22: Tightening pressure screws......................... 40
Fig.23: Oil monitoring................................................. 45
Fig.24: Overview: speed measurement on high-
pressure stage .............................................................. 47
Fig.25: Noise insulation, bellows............................... 51
Fig.26: Bellows ............................................................. 60
Fig.27: Swivel lifting eye (example)........................... 71
Fig.28: Weights of the assemblies............................ 72
Fig.29: Removing the gas outlet casing................... 73
Fig.30: Removing the air inlets ................................. 74
Fig.31: Removing the compressor casing................ 75
Fig.32: Removing the cartridge group...................... 77
Fig.33: Removing the gas outlet flange / nozzle ring.
78
Fig.34: Nozzle ring compression PD ......................... 79
Fig.35: Installing the gas outlet flange / nozzle ring..
80
Fig.36: Installing the cartridge group....................... 81
Fig.37: Installing the compressor casing ................. 82
Fig.38: Installing the air inlet...................................... 83
Fig.39: Installing the gas outlet casing .................... 84
Fig.40: Measuring clearances N and R...................... 85
Fig.41: Measuring clearance A and B......................... 86
Fig.42: Overview of tightening torques ................... 87
Fig.43: Attaching a cover plate .................................. 90
Fig.44: Cover plate drawing ....................................... 91
Fig.45: Figure for cover plate, slots for O-rings ..... 92
Page 112 / 114Page 112 / 114

Table of Contents

Related product manuals