5. Slowly and carefully pull the MVCS out of the container using the forklift. The forklift
must be perfectly aligned to the MVCS, so that the station does not touch the container
walls.
Aux. Breakers and others
1W
Ø200
152
Optional: Pull the MVCS until connection with spreader and crane is possible. Then
follow the lifting procedure to place the MVCS.