Refer to the tables in the Technical reference manual /Station communication,
specifying the information types supported by the communication protocol IEC
60870-5-103.
To support the information, corresponding functions must be included in the
protection IED.
There is no representation for the following parts:
Generating events for test mode
Cause of transmission: Info no 11, Local operation
Glass or plastic fiber should be used. BFOC/2.5 is the recommended interface to
use (BFOC/2.5 is the same as ST connectors). ST connectors are used with the
optical power as specified in standard.
For more information, refer to IEC standard IEC 60870-5-103.
21.7 DNP3 Communication protocol
21.7.1 Application
GUID-EF1F0C38-9FF6-4683-8B10-AAA372D42185 v1
For more information on the application and setting guidelines for the DNP3
communication protocol refer to the DNP3 Communication protocol manual.