EasyManua.ls Logo

ABB Relion 615 series - Page 184

ABB Relion 615 series
220 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PHPTUV2
O:78|T:5|I:2
BLOCK TRIP
PICKUP
PHPTOV2
O:75|T:5|I:2
BLOCK TRIP
PICKUP
NSPTOV2
O:76|T:5|I:2
BLOCK TRIP
PICKUP
ROVPTOV3
O:73|T:5|I:3
BLOCK TRIP
PICKUP
SEQRFUF2_60-2_FUSEF_U
SEQRFUF2_60-2_FUSEF_U
SEQRFUF2_60-2_FUSEF_U
PHPTOV2_59-2_TRIP
PHPTUV2_27-2_TRIP
NSPTOV2_47-2_TRIP
ROVPTOV3_59N-2_TRIP
GUID-9DE7CD91-E7CF-4259-8444-F319579843BC V1 EN
Figure 233: Voltage functions on bus 2
The circuit-breaker failure protection CCBRBRF_50BF is initiated via the PICKUP input
by a functions connected to the Master Trip 1 and by opening command of the circuit
breaker. CCBRBRF_50BF offers different operating modes associated with the circuit-
breaker position and the measured phase and residual currents.
CCBRBRF_50BF has two operating outputs: TRRET and TRBU. The TRBU output can be
used to give a backup trip to the circuit breaker feeding upstream. In the configuration the
TRBU output signal is connected to the output SO1 (X100: 14, 15, 16).
CCBRBRF1_50BF-1 use the source 1 (bus 1) voltages whereas CCBRBRF2_50BF-2 use
the source 2 (bus 2) voltages.
Section 3 1MAC109016-MB C
REF615 standard configurations
178 REF615 ANSI
Application Manual

Table of Contents

Other manuals for ABB Relion 615 series

Related product manuals