210 System Manual SCK Gas Sampling System 42/23-81 EN Rev. 4
Step Procedure
7
Open shut-off valve -J63 and allow cooling water to flow in slowly
until bubble-free cooling water appears at the heat exchanger drain
valve.
8
Close shut-off valve -J63.
9
Close vent cock on heat exchanger, screw on cap.
10
Open shut-off valve -J63 again slowly and observe cooling-water
pressure display on the touchscreen. Fill cooling water to a pres-
sure of 1-1.5 bar (1000-1500 hPa).
Note: It is advisable for two people to do this job.
11
Switch the cooling-water pump -M51 on again at motor breaker -
F37 or circuit breaker -F36.
12
Close control cabinet again.
13
Turn service switch back to OFF position and insert probe again
using the controller.
WARNING! Probe moves into the kiln. Do not stand in the area of
travel of the probe or probe carriage until the probe is com-
pletely inserted into the kiln and the warning lamps go out.