66 System Manual SCK Gas Sampling System 42/23-81 EN Rev. 4
In order to ensure safe handling of the gas sampling system, personnel must work
in certain work places designated for their activity.
The work places for the various activities are located in the following places:
Activity Work places
Installation
Start-up
Maintenance
Shutting down
at the various modules of the gas sam-
pling system, depending on the task
Operation depending on the particular task
at the control cabinet to operate the
software
around the gas sampling system to
monitor operation, but NOT in the dan-
ger area around the retractor that is
protected by the protective installation.
Work places