How to install the vibration pick-up
How to install the vibration pick-up is provided for by JIS standard 'Method of measuring the
vibration level JIS Z 8735 '.
Please install the vibration pick-up on flat and firm ground.
( For example. Beaten ground, concrete, and asphalt, etc. )
When the Soft ground, harden ground by beating in the block etc. and please install at
a position that is as higher as surrounding ground than possible in which it doesn’t a
puddle during the rainfall. There is a possibility that breaks down by going the under water.
Installation example
< Installation example to flat and firm ground >
< Installation example to soft
ground >
< Bad examples >
Flat and
firm
ground
( eaten ground,concrete, and asphalt, etc )
Harden
ed
the ground and put pickup at
the position that is higher than the ground
of the circumference not to soak in water.
There is a possibility that the breakdown occurs
by submerge when setting it up at a position that
is lower than surrounding ground.
Puddle
Puddle
Vibration pick-up
Vibration pick-up
Vibration pick-up