EasyManua.ls Logo

ADT ACCORD XPC - Group 8 - Option 9 Communicate Periodic Test Report; System Programming - Group 9 Parameters

ADT ACCORD XPC
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
35
Accord xpC - July, 2001
Group 8 — Option 7 Communicate Verified Alarm
This option has two settings:
0. No (Verified Alarm comm disabled).
1. Yes (Verified Alarm Comm enabled).
This option defaults to 0 (Verified Alarm Comm disabled).
Group 8 — Option 8 Communicate Battery Low and AC Mains Failure
This option has two settings:
0. No (Batt Low/AC Fail Comm disabled).
1. Yes (Batt Low/AC Fail Comm enabled).
This option defaults to 0 (Batt Low/AC Fail Comm disabled).
Note: A.C. mains failure is transmitted after a one hour delay.
Group 8 — Option 9 Communicate Periodic Test Report
This option has four settings:
0. Periodic Test Report Comm disabled.
1. Periodic Test Report Comm enabled—24 hr test period.
2. Periodic Test Report Comm enabled—7 day test period.
3. Periodic Test Report Comm enabled—31 day test period.
When enabled (set to 1, 2 or 3) , the time between periodic test signals is dependant on
the option selected.
This option defaults to 0 (Periodic Test Report Comm disabled).
System Programming — Group 9 Parameters
Table 3.14 System Parameters
SNOITPOMETSYS
PUORGNOITPOTLUAFED
9.)seY=1,oN=0(senoZdettimOetacinummoC=1)0(
9.)seY=1,oN=0(langisteS/tesnUtrevnI=2)0(
9.)rebmunenoz=81,enoN=0(enozkconKelbuoD=3)0(
9.)seY=1,oN=0(timOenoZresU=4)1(
9.)seY=1,oN=0(teseR/tesnUnoslangiserotserdneS=5)0(
9.)seY=1,oN=0(dewollanoitaivedyrtnE=6)0(
9.)seY=1,oN=0(goltnevetnirP=7)0(
9)seY=1,oN=0(sgnittestluafedyrotcaF=8)0(
9.)seY=1,oN=0(noisreverawtfosweiV=9)0(

Table of Contents

Related product manuals