EasyManua.ls Logo

Advanced Instruments 4C3 - Page 95

Advanced Instruments 4C3
139 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
g. At “Stir/Freeze Test”, press START. The display will change
to “[stir] [freeze]”.
h. At “[stir] [freeze]”, a freeze pulse will occur each time the >
button is pressed. Watch the tip of the stir/freeze wire and press
>. The freeze-pulse vibration should produce a loud buzz. If
properly adjusted as recommended in section 5, the stir/freeze
wire should vibrate principally fore and aft and should never
strike the probe.
i. Manually move the operating head to a position slightly for-
ward of the probe wipers, such that the stir/freeze wire vibration
will be unimpeded by the wipers and clearly visible in front of
the probe.
Watch the stir/freeze wire vibrate as you press > again. The
freeze-pulse vibration blur at the very tip of the stir/freeze wire
should span at least 1/2 or 13 mm for one second, then cease.
If the freeze vibration is inadequate, do not proceed further but
refer the problem to a qualified service person with a 4C3 ser-
vice manual or telephone for Hot-Line® service as recommend-
ed in Chapter 5, Section C.
If the freeze vibration is adequate, check and adjust the stir
vibration amplitude as follows:
73
Troubleshooting & Service
Figure 11: Probe and Stir/Freeze Wire Alignment

Related product manuals