EasyManua.ls Logo

Advanced Instruments 4C3 - D. Additional unpacking & installation

Advanced Instruments 4C3
139 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D. Additional unpacking & installation
The following additional unpacking and installation procedures
should be accomplished before power is applied to the instrument:
1. Open the magnetically held, drop-down cassette deck cover (see
figure 3) by pulling its frame forward and down.
2. Remove the two screws and top half of the operating head ship-
ping fixture (see figure 4); store them in case of possible future
transport of the instrument.
5
Installation & Setup
Figure 4: Additional Unpacking Steps

Related product manuals