1 Agilent 8860 GC Site Preparation
Bench Preparation
Site Preparation Guide 7
Bench Preparation
When planning a bench layout:
• Consider component dimensions, weights, and space requirements. See “Dimensions and
Weight” on page 18.
• Consider the lengths of cables and hoses for connection of components. See “Maximum
Length of Cables and Hoses” on page 10.
• For systems that include an MS, consider foreline pump requirements. See “Foreline
Pump Requirements for Systems Including an MSD” on page 20.
• Allow space for operational access.
• Note that the 7200 Q-TOF requires 48 cm (1.6 ft) of space in front to allow for the RIS
probe extraction tool handle when installed.
• Note that some repairs to the GC/MS, or to the GC itself, will require access to the back of
the instrument(s).
Examples are provided here for systems including a GC with an ALS, computer and printer.
Most examples also include an MS.
See several example layouts below.