Site Preparation Guide 5
1 Agilent 8860 GC Site Preparation
Site Preparation Checklist 6
Bench Preparation 7
Maximum Length of Cables and Hoses 10
This guide outlines the site requirements for GC, GC/MS, and automatic liquid sampler (ALS)
installation. Site requirements include the necessary space, electrical supplies, gas supplies,
operating supplies and consumables required to successfully install the GC and related
instruments and systems.
The site must meet the requirements specified in this guide before beginning installation.
Refer to the Agilent Web site at www.agilent.com for the most up-to-date listing of GC, GC/MS,
and ALS supplies and consumables.