Getting Started
Agilent Vapor Generation Accessory VGA 77 and VGA 77P User’s Guide 17
3. Getting Started
Unpacking 17
Installation 18
Installation Checklist 19
Gas Supply Requirements 20
Power Supply Requirements 22
Installing the Pump Unit 24
Installing a Reagent Module 24
Installing the Drain Tubing 25
Installing the VGA 77 Pump Tubing 27
Installing the Burner Clamp 29
Installation of Zeeman Adapter for 240Z/280Z AA 33
Installing the Cell 36
Connecting the Gas/liquid Separator Outlet 38
Connecting a Mercury Trap (for AA only) 41
Connection to the Autosampler 42
Unpacking
Carefully open the shipping case and the enclosed packages. Inspect
all parts for damage in transit. Any damage should be reported
immediately.
You should have received the following:
VGA 77 pump unit (with mounting bracket if ordered for the
700 Series ICP-OES instruments)
Cover for the pump unit
Drip tray for the pump unit