Getting Started
18 Agilent Vapor Generation Accessory VGA 77 and VGA 77P User’s Guide
Reagent module with two reagent bottles
Two quartz cells with a length of black fluoro-elastomer tubing
(AA only)
Power cable
Tubing and connectors kit and spare 6 mm ID hose (used to
connect a mercury trap)
Clear tubing (10 mm ID)
Hose clamp and fuses
Cell holder for Mark 7 burner (AA only)
NOTE
Spare parts and their part numbers are given on Page 79.
Installation
Before proceeding with the installation, you should read the ‘Safety
practices and hazards’ section at the start of this manual. You should
also be completely familiar with the safety procedures required for
operation of your spectrometer.
During installation, refer to the following diagram to help you
identify the different parts of your VGA and pump module.