EasyManua.ls Logo

Aichi SR12C - Boom Operation

Aichi SR12C
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
󱒨󱓍󱓆󱓕󱓙󱓊󱓗󱒅󱒝󱒅󱒒󱒅󱒴󱓕󱓊󱓗󱓆󱓙󱓎󱓔󱓓
37
(2) Forward/Backwardrightturns
M085B301
fig.8‒19
NOTICE
Ifthedirectionoftravelcannotbe
changedduetoroadsurfaceconditions,
firstadjustthepositionofthemachine
bytravelingforwardorbackward,then
changecourse.
SpinTurn3‒2‒4
Depressthefootswitchandoperatethetravel
controlleversasshowninthefigurebelow
tomaketheCW(clockwise)orCCWspinturn
(counterclockwise).
M085B401
SpinturnCWSpinturnCCW
fig.8‒20
BoomOperation3‒3
WARNING
Makesurethatnopersonorobstacleis
aroundthemachinebeforeoperating
theboom.Theturntableprotrudes
850mmbeyondthewidthofthechassis
whenrotatingtheboom.
Ifyourvisionispoor,haveaguideto
assistyou.
M0863201
850mm
fig.8‒21
NOTICE
• Beforerotatingtheboom,makesure
therotationlockpinhasbeenunlocked.
• Theboommaynotrotatesmoothly
whenthemachinetilts.
Usethethreecontrolleversfortheboom
elevation,telescopeandrotationtooperate
theboom.
Andusetheflyjibswitchtooperatetheflyjib
elevation.(Ifequipped)
M085F722
FlyJibSwitch
(ifequipped)
BoomRotation
ControlLever
BoomTelescope
ControlLever
BoomElevation
ControlLever
fig.8‒22
BoomElevating3‒3‒1
Depressthefootswitchand
operatetheboomelevationcontrol
levertoraiseorlowertheboom.
BoomRotating3‒3‒2
Depressthefootswitchand
operatetheboomrotation
controllevertorotatetheboom.
BoomTelescoping3‒3‒3
Depressthefootswitchand
operatetheboomtelescope
controllevertoextendorretract
theboom.
FlyJibElevating(Ifequipped)3‒3‒4
Depressthefootswitchand
operatetheflyjibswitchtoraiseor
lowertheflyjib.

Table of Contents

Related product manuals