44
TieDown2.
󱒸󱓙󱓊󱓕󱒅󱒖
Tiedownthechassis
ofthemachinetothe
transportvehiclebed
securely.Placepadson
thecrawlertrackstoprotectit.(fig.102,A)
M0858203
A
A
g.10‒2
󱒸󱓙󱓊󱓕󱒅󱒗
Tiedowntheboomandplatformsothat
itisnotswungduringthetransportation.
Atthistime,besuretoallowtheclearance
betweenthebottomoftheplatformandthe
transportvehiclebed.
Ifequippedwiththeflyjib,tiedownthe
platformwithplacingawoodblockunder
theplatformtopreventtheplatformfrom
bouncingduringthetransportation.
M0858321
Ifequipped
withtheflyjib
Woodblock
Tiedownrings Tiedownrings
Clearance
Clearance
g.10‒3
NOTICE
Donottightenthetiedownchains
orwireropesmarked“”toomuch.
Tightenthemjustsothattheplatform
isnotswungorbouncedduringthe
transportation.
HoistingtheMachine3.
WARNING
• Donotallowanypersontogetunder
themachinewhilehoisting.
• Donotpasstheslingchainsorwire
ropesexceptdesignatedrings.
• Failuretoheedwarningscouldresult
inbreaking,falling,orotherhazards
leadingtodeathorseriousinjury.
󱒸󱓙󱓊󱓕󱒅󱒖
Retractandlowertheboomfully,and
positiontheflyjibtohorizontalifequipped.
󱒸󱓙󱓊󱓕󱒅󱒗
Passtheslingchainsorwire
ropesthroughthehoistingrings
locatedontheturntableas
showninthefig.104.
󱒸󱓙󱓊󱓕󱒅󱒘
Adjusttheriggingtopreventdamagetothe
machineandtokeepthemachinelevel.
M0858420
1400mm
1400mm
Ifequipped
withtheflyjib
g.10‒4