EasyManua.ls Logo

Allied Telesis GS910 Series - Page 40

Allied Telesis GS910 Series
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GS910 Series Gigabit Ehternet Unmanaged Switch Installation and User’s Guide
40
4. Have another person hold the switch with the brackets at the wall
location where the switch is to be installed, while you use a pencil to
mark the wall with the locations of the four holes in the brackets. See
Figure 19 as an example.
x
Figure 19. Marking the Screw Hole Locations
5. Pre-drill the marked locations on the wall.
6. Install the four plastic anchors into the wall in the holes drilled in Step
5.

Table of Contents

Related product manuals