Opus Operator's Manual 3-1
Installation
3.1 Introduction
The system is designed for installation in an office or a clinic and requires minimal
site preparation. When the system is purchased, complete on-site installation,
including initial system testing and calibration, is included.
System transportation and installation is carried out by Alma Lasers authorized
technical personnel, who will do the following:
• Unpack the system and position it in its pre-selected location
• Verify the integrity of the system and its components
• Connect system components (applicators, footswitch)
• Plug the system into a designated electrical outlet
• Test the system for proper calibration and functional operation of all
components and software
• Coordinate the performance of an on-site safety inspection, if required.
Note
Any damage to the packaging or to the system found prior to opening the
package should be reported to your Alma Lasers representative and to the
insurance carrier.
3.3 Facility Requirements
Before unpacking the system, ensure that the site meets the requirements described
in the following sections.