3 | Getting Started BYK-Gardner GmbH
18 wave-scan 3 / wave-scan 3 dual 301 200 085 E 2309
3 Getting Started
Before operating the instrument for the first time, please read the operating man-
ual completely and take particular notice of the safety instructions. Unpack the in-
strument and check the delivery for completeness; see Delivery Content.
3.1 System Diagram
The entire system consists of instrument, docking station and test tiles and soft-
ware for data transfer and analysis.
To assemble the measurement system, place the instrument in the docking station
and power the docking station.
• Connect docking station with power supply (1).
• Power is provided to the instrument by the rechargeable battery pack; charged
in the docking station.
• The delivery comprises a second rechargeable battery pack; you can use one of
them while recharging the other one.
• Place instrument in the docking station (2).
• The docking station automatically charges the battery pack in the docking sta-
tion and in the instrument.
• Connect docking station with PC via USB cable (3).
• Download and install the software ”smart-chart” (4).
• Turn instrument on by pressing the Operate button.
The instrument switches off automatically, if not used. To switch it off manually,
select Configuration > Shutdown.