Chapter 1
Overview
The following topics are covered in this section:
• Scope
• Receiving and Inspecting the Equipment
• Installation Process
• Safety Information
• Obtaining Technical Assistance
• Specifications
1.1 Scope
This guide is intended for properly trained service personnel and technicians who need to install the
following Arista Networks Data Center Switches:
• DCS-7804
• DCS-7808
• DCS-7812
• DCS-7816
Important: Only qualified personnel should install, service, or replace this equipment.
Seul le personnel qualifié doit installer, service, ou remplacer cet équipement.
1.2 Receiving and Inspecting the Equipment
Upon receiving the switch, inspect the shipping boxes and record any external damage. Retain packing
materials if you suspect that part of the shipment is damaged; the carrier may need to inspect them.
If the boxes were not damaged in transit, unpack them carefully. Ensure that you do not discard any
accessories that may be packaged in the same box as the main unit.
Inspect the packing list and confirm that you received all listed items. Compare the packing list with
your DCS-7800 Series Modular Switches purchase order. Parts List provides a list of components
included with the switch.
1.3 Installation Process
Perform the following steps to install and use the switch:
1. Select and prepare the installation site (Site Selection).
2. Assemble the installation tools listed (Tools and Parts Required for Installation).
3. Attach the mounting brackets and install the switch in an equipment rack (Rack Mounting the
Switch).
4. Connect the switch to the power source and network devices (Cabling the Switch).
5. Configure the switch (Configuring the Switch).
1