EasyManua.ls Logo

ASV 2810 - SECTION 4 - GENERAL MAINTENANCE: ENGINE AND DRIVES; PLANETARY DRIVES

ASV 2810
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
POSI-TRACK 2800 & 2810
PAGE 28
ASV, INC.
ENGINE
The engine is ready for normal use; however,
extra care during the first 100 hours will result
in longer engine performance and life. During
the break-in period set the engine at 2400 rpm.
Brief periods of full throttle operation and
variations in engine load also contribute to
good engine break-in.
PLANETARY DRIVES
Each track’s final drive consists of a hydraulic
drive motor, a planetary gearbox and an inter-
nal drive sprocket. The planetary gearbox re-
quires a break-in period for the lug nuts and
for the planetary oil. The 9 lug nuts, which
attach the sprocket to the planetary gearbox,
are torqued to 115 ft.-lbs. at the factory, and
should be re-torqued to 115 ft.-lbs. after 10
hours of operation. (Fig. 34)
The planetary gearbox requires an oil change
at 50 hours. The break-in time allows the
gears in the planetary to properly mesh. This
is a
crucial
oil change since the oil will have a
high metal content. After this initial oil
change, the planetary oil should be changed
every 1,000 hours or annually. (Refer to page
36 for proper planetary oil changing proce-
dure.)
Fig. 34
CAUTION
Failure to change the planetary oil at the
50 hour break-in interval, will drastically
shorten the life of the planetary gear
box. Failure to follow this procedure
will also void the warranty of the plane-
tary gear box.
Lug nuts
GENERAL MAINTENANCE

Related product manuals