POSI-TRACK 2800 & 2810
PAGE 31
ASV, INC.
DRIVE SHAFT
The drive shaft must be greased every 250
hours. Lack of grease will cause a failure of
the drive shaft, which could cause damage to
other components.
The time it takes to grease the drive shaft can
be kept to a minimum if the following instruc-
tions are used.
1. Remove seat.
2. Remove drive shaft / hose guard panel.
3. Using a grease gun with a hose extension,
grease both u-joints of the drive shaft. There
is also a grease fitting in the middle of the
drive shaft that needs to be greased. (Fig. 41)
GENERAL MAINTENANCE
Fig. 41

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ASV 2810 and is the answer not in the manual?

ASV 2810 Specifications

General IconGeneral
BrandASV
Model2810
CategoryCompact Loader
LanguageEnglish

Related product manuals