EasyManua.ls Logo

Atlas Copco FlexiROC T20 R - Setup for Drilling - General Principles; General Setup

Atlas Copco FlexiROC T20 R
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
87
Operator's instructions
6. Before drilling
Setup for drilling - General principles
General setup
Align the rig as horizontally as possible using the jacks .
Place the feed spike firmly against the ground without lifting the frame off the
ground.
Note
Position the boom and feeder with smooth movements.

Table of Contents

Related product manuals