EasyManua.ls Logo

Atlas Copco FlexiROC T20 R User Manual

Atlas Copco FlexiROC T20 R
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
PM No. 9852 2467 01a
Atlas Copco
FlexiROC T20 R
Operator's instructions

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Atlas Copco FlexiROC T20 R and is the answer not in the manual?

Atlas Copco FlexiROC T20 R Specifications

General IconGeneral
BrandAtlas Copco
ModelFlexiROC T20 R
CategoryIndustrial Equipment
LanguageEnglish

Summary

General Information

Foreword

Introduction to the operator's manual and its purpose.

Principal Components

Identifies and labels the main parts of the drill rig.

System Overview

Explains electrical, hydraulic, air, chassis, power pack, boom, and dust collector systems.

Technical Data

Specifications and Limits

Details weight, performance, tilt angles, and operational environment limits.

Dimensions and Coverage

Provides transport dimensions, operational coverage area, and danger zone.

Daily Checks

Pre-Operation Checks

Foreword, extra safety checks, and procedures before starting the machine.

Post-Start and Drilling Checks

Functionality tests after starting and checks performed during drilling operations.

Controls

Control Interface Overview

General illustration of control elements and the remote control box.

Remote Control Functions

Detailed explanation of remote control buttons, selectors, and operational modes.

PMI and Screen Controls

Description of the PMI unit, screen navigation, parameters, and settings.

Specialized Control Panels

Manometer panel, gradient meter, CBM panel, electric cabinet, and emergency exclusion.

Operating Procedures

General Operation and Safety

Overview of control points, general information, and operating safety warnings.

Engine Start and Stop

Procedures for starting and stopping the engine from CBM, PMI, and remote controls.

Enabling Controls and Repositioning

How to enable controls and general warnings for repositioning the drill rig.

Moving and Tramming Operations

Procedures for moving the rig from CBM, PMI, remote, and general tramming principles.

Winch and Translation

Guidelines for using the winch and performing translation with PMI/Remote control.

Before Drilling Setup

Safety and Setup Warnings

General safety warnings and risk of tipping for setting up the drill rig.

Setup Procedures

Step-by-step setup using PMI/Remote, general principles, and slope considerations.

Drilling Operations

Starting Drilling

Procedures to initiate drilling from PMI and the control panel.

Drilling Adjustments and Checks

Feeder adjustments and checks performed during drilling operations.

Rod Handling Procedures

Loosening, detaching, adding, and unthreading drill rods.

Drilling Troubleshooting

Changing the drill bit, and troubleshooting common drilling problems.

Options

Electric Filler Pump

Instructions for using the electric filler pump for refueling the drill rig.

Related product manuals