4 Operating instructions
4.1 Before starting
Perform all daily checks and maintenance as
specified in the “Maintenance schedule” on page
42.
With the light tower standing level, check the
engine oil level and top up if necessary. The oil
level must be between the MIN and MAX levels
on the engine oil level dipstick.
Check the fuel level and top up if necessary. It is
recommended to fill the tank after the day’s
operation to prevent water vapour in a nearly
empty tank from condensing.
Check the tightness of all bolts and nuts. For
torque values, see chapter “Critical bolt
connections” on page 87.
Check that circuit breaker Q1 is switched off.
Check that the fuses have not tripped and that the
emergency stop is in the OUT position.
Check that the load is switched off.
4.2 Operating the light tower
4.2.1 Before the engine is started
1. Before starting the engine, check that all the
automatic switches (general ELCB, sockets
protection and lamp circuit breakers) are in the
OFF position (1).
2. If the optional External power input (230 VAC) is
installed, select the desired operating mode with
S10 (Genset/OFF/Mains).
In your own interest, always strictly
observe all relevant safety
instructions.
Do not operate the light tower in
excess of the limitations mentioned
in the Technical Specifications.
Local rules concerning the setting
up of low voltage power installations
(below 1000 V) must be respected
when connecting site distribution
panels, switch gear or loads to the
light tower generator.
At each start-up and at any time a
new load is connected, the earthing
and protections (GB trip and earth
leakage relay) of the light tower
must be verified. Earthing must be
done either by the earth pin or, if
available, by an existing, suitable
earthing installation. The protective
system against excessive contact
voltage is not effective unless a
suitable earthing is made.
Carefully read and follow in
sequence all the operating
instructions in the Engine's manual
as well as those contained in this
manual!
S50
S51
S20
0
1
H16
Q2 Q3 Q4 Q5Q1 Q6
P7
AUTO MAN
F10
AUTO MAN
GE
S10
1
S10
00_00_HiLight H6+_EN.book Page 29 Friday, June 4, 2021 11:52 AM

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atlas Copco HiLight H6+ Kd ESF and is the answer not in the manual?

Atlas Copco HiLight H6+ Kd ESF Specifications

General IconGeneral
BrandAtlas Copco
ModelHiLight H6+ Kd ESF
CategoryLighting Equipment
LanguageEnglish

Related product manuals