EasyManua.ls Logo

Automatic Systems BL 229 - Levelling of the Boom Arm

Automatic Systems BL 229
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.5. LEVELLING OF THE BOOM ARM
1. First check the position of the levers on the arm shaft ( Fig. 24, page 28).
2. Close the barrier to put the arm in its horizontal position.
3. On the connecting rod ( Rep. 20, Chap. 5.1, page 9), loosen nuts (1) and (2).
One nut has a left-hand thread and the other one a right-hand thread.
4. Turn the connecting rod in the clockwise direction to make the arm rise and anti-clockwise to make it descend. Check the
arm’s horizontality by means of a spirit level.
5. Tighten the nuts.
3
1
20
2
3
Fig. 28 - Connecting rod assembly
32
BL 229

Table of Contents