EN15
C - INSTALLATION
4 - INSTALLING THE FLASHING LIGHT
The ashing light must be attached to the top of the post on which the switchgear is mounted, and it must
be visible from both the inside and the outside.
• Unscrew the upper part of the ashing light
• Drill two holes in the bottom of the case to pass the two screws that will secure it to the post.
• Attach the ashing light onto the post.
• Close the light by screwing the upper part of the ashing light back on.
Connect the ashing light by locating the colour of the wires in order to transfer them to the electronic card.