7. Preventive maintenance
7. PREVENTIVE MAINTENANCE
This chapter is intended for trained personnel or exp ert operators.
Overview
• Monthly maintenance
• Year ly maintenance
• 3 y early maintenance
• 30000 h ours maintena nce
7.1 Monthly maintenance
Overview
Description
Comments
Required parts
Check/clean/replace air filter Check the air filter for dust and grease. Clean if necessary. If
not possible due to damage, replace with a new one.
Spare Chiller filter
7.2 Yearly maintenance
Overview
Description Comments Required parts
Check air extraction system Check booth air extraction system for adequate extraction
Check for InfoT’s Check if any Info-T have been released that need an
intervention on the ULC-30A.
Check runtime Check runtime to verify if any runtime-driven interventions are
required.
Check for leaks Check for liquid leaks in the ULC-30A
Check insulation Check status of insulation
7.3 3 yearly maintenance
Overview
Description Comm ents Required parts
Flush cooling liquid Replace the cooling liquid of the s ystem (± 30l)
ULC-30A draining and refill tool neede
d. Includes refill tool,
Service SW, cable to connect laptop to chiller.
Cooling liquid 5l
Toolin g
7.4 30000 hours m aintenance
Overview
Description
Comments
Required parts
Replace Secondar y cooling unit
Replace together with Main Pump
DCM-60A secondary
cooling unit
R5905866 ULC-30A 31/01/2018 33