EasyManuals Logo

BARTEC BENKE A Series User Manual

BARTEC BENKE A Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
Storage, transport and start of operation
11
Instruction Manual PETRO 3003 VOLUTANK Gauging unit BA 140918
The water still remaining in the pipes can be discharged via the ball valve on
the gauging unit. Open the ball valve to drain the residual water.
Ball valve closed
Ball valve open
NOTE:
It can take some time to drain the unit.
The ball valve is fitted with a safety clip to prevent accidental opening.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BARTEC BENKE A Series and is the answer not in the manual?

BARTEC BENKE A Series Specifications

General IconGeneral
BrandBARTEC BENKE
ModelA Series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals