Storage, transport and start of operation
14
Instruction Manual PETRO 3003 VOLUTANK Gauging unit BA 140918
Windows XP:
Control Panel Power Options
- Under no circumstances should the PC be locked, be switched to Hibernate
state or the user changed during operation.
- The PC should always be operated with power plugged in.
4.3.1.1 Required vehicle version
The gauging unit and the applicable software can be used from vehicle ver-
sion Pyramide 1.21.5 onwards. Older vehicle applications are NOT support-
ed!
4.3.1.2 Configuring System 3003
System 3003 must be installed and configured ready for operation.
The tilt valve (log. 26) and the bottom valves of the chambers which are to
be emptied/filled are required for the gauging process.
The left control (log. 14) and the right control (log. 20) may also be required,
where fitted and necessary for the gauging process.
The dipstick interface must also be configured and all the dipsticks set up
correctly.