Storage, transport and start of operation
12
Instruction Manual PETRO 3003 VOLUTANK Gauging unit BA 140918
4.3 Putting the gauging unit into opera-
tion
Always check the gauging unit for damage before putting it into operation.
Take measures to prevent the gauging unit from rolling away. Two castors
are fitted with brakes which can be applied for this purpose.
4.3.1 Requirements
The following requirements must be met in order to be able to use the gaug-
ing unit:
The gauging unit is supported from vehicle version PYRAMIDE 1.21.5
onwards.
System 3003 must be installed and configured ready for operation.
The vehicle air must be connected in such a way that all the necessary
valves can be operated.
The power on the gauging unit must be connected.
The air on the gauging unit must be connected.
The vehicle must be connected to the gauging unit by means of an
Ethernet cable.
The gauging PC must be connected to the gauging unit by means of an
Ethernet cable.
The gauging PC must have a static IP address.
The gauging PC must have current ALI software.
The hose connecting the vehicle to the "IN" port on the gauging unit must
be consistently inclined at all times.
CAUTION!
The gauging unit must not be operated in potentially explosive areas.
Under no circumstances should the PC be locked or the user changed
during operation.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BARTEC BENKE A Series and is the answer not in the manual?

BARTEC BENKE A Series Specifications

General IconGeneral
BrandBARTEC BENKE
ModelA Series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals