EasyManua.ls Logo

BARTEC BENKE A Series - Servicing and Replacing the Impeller

BARTEC BENKE A Series
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Servicing, maintenance and cleaning
46
Instruction Manual PETRO 3003 VOLUTANK Gauging unit BA 140918
6.2 Servicing and replacing the
impeller
Follow the instructions below to service or replace the impeller:
Drain the unit completely, referring to the relevant instructions in section
4.2.
Switch the unit off by turning the main switch, and take measures to
prevent the unit from being switched back on.
Undo the two screws on the impeller housing:
Undo these two cap nuts.
Remove the cover and safety clip:
Pull the impeller forwards out of the housing
Follow the steps in reverse order to refit the impeller.
When inserting the impeller it is recommended to use Vaseline.
CAUTION:
Never let the pump run without the cover and never let the pump run dry!

Table of Contents

Related product manuals