Storage, transport and start of operation
10
Instruction Manual PETRO 3003 VOLUTANK Gauging unit BA 140918
4 Storage, transport and start
of operation
4.1 Storage and transportation of the
gauging unit
The gauging unit may only be transported with suitable lifting gear capable
of bearing its weight.
Gross weight as specified on type plate. Crane transport is not permitted.
Do not allow the wheels on the gauging unit to bear the weight during stor-
age and transportation.
4.2 Complete drainage of gauging unit
The unit must be completely drained after every gauging process.
Open the "Manual control" tab on the PC and then open the IN and OUT1 or
OUT2 valves (depending on which hose is connected).
Then select the relevant direction of rotation and speed of the pump (e.g.
70%) and start the pump.
Leave the pump switched on until no more water can be seen in the sight
glass and the -10B1 sensor is no longer wet.
Switch the pump off and close the inlet and outlet valves.