9.2 Ventilation of the lubrication system
9.2.1 Ventilation of a progressive lubrication pump
· Ventilate the whole lubrication system after the first operation and after each lubricant exchange!
· Ventilation is done at pressure less operation and open outlets of the system.
· Operate the pump until lubricant comes out of the pressure connection without air inclusions.
9.2.2 Ventilation of a single line lubrication system
· Ventilate the complete system after the start-up and after the reservoir has been empty.
· Ventilation is done by opening the ventilation screws at the main line end!
· Actuate the pump until lubricant comes out of the main line without air inclusions!
9.3 Rotation control of the pump
· Compare the rotation of the fan with the directional arrow.
· In case of wrong direction check the wiring to the terminal box and change it.
Longer operation with the causes !wrong direction motor and pump damages
10. Maintenance
Stop before maintenance or repairthe voltage feed, starting with .
Maintenance and repair standstillwork may only be done at of the central lubrication pump and pressure
less conditions. Check the surface temperature of the device, due to danger of burning by radiant heat.
Always wear heat-resistance gloves and protection goggles! Soiled or contaminated surfaces have to be
cleaned before maintenance works, wear protective cloths if necessary. Protect the device against
unintentional reactivation during maintenance and repair works!
Further information and technical details regarding the components can be found in the enclosed operating
manuals of the components.
10.1 General maintenance
· Retighten all fittings 6 weeks after start up.
· Check all components for leakage and damages every four weeks.
If leakages are not repaired, lubricant can . Remove possible leakages ofcome out with high pressure
lubricant immediately.