Do you have a question about the Biotech TLM-Pro and is the answer not in the manual?
Annual mandatory maintenance by authorized personnel is required for system reliability and efficiency.
Mandatory installation of automatic return flow increase to protect the boiler from low temperatures.
Requirements for chimney type, draught, and flue pipe installation for optimal system performance.
Defines flue length between inlet and mouth, adapting to local regulations for performance.
Requirement for a draught regulator and potential implications of its placement.
Provides detailed specifications for various boiler models, essential for comparison and selection.
Physical dimensions and installation clearances for the TLM-PRO model.
Physical dimensions and installation clearances for the TLM-PRO MBW model.
Physical dimensions and installation clearances for the PZ 25 RL model.
Physical dimensions and installation clearances for the PZ 25 RL MBW model.
Physical dimensions and installation clearances for the PZ 32/35 PRO model.
Physical dimensions and installation clearances for the PZ 32/35 PRO MBW model.
Physical dimensions and installation clearances for the PZ 45/50/55 RL model.
Physical dimensions and installation clearances for the PZ 65/69 RL model.
Physical dimensions and installation clearances for the PZ 80 RL model.
Physical dimensions and installation clearances for the PZ 90/100 RL model.
Recommendations for locating the boiler room for optimal combustion air supply.
Switch off heating before filling; longer pipes may reduce pellet quality.
Calculations for determining the required storage space based on heating load.
Wall strength and construction requirements to support pellet weight.
Pellets are hygroscopic; storage must be dry to prevent damage.
Procedures for cleaning and maintaining the pellet storage area.
Illustrates typical layout and components of a pellet storage room.
Observe country-specific regulations for doors and hatches.
Guidelines for safe and effective pellet filling system installation.
Design requirements for sloping floors to ensure complete pellet emptying.
Requirements for covering or protecting internal fixtures within the storage room.
Information on alternative discharge systems and warranty implications.
Specifics on dual extraction systems for PZ 90/100 RL models.
Placement and installation requirements for pellet suction points.
Minimum distance requirement between suction point and wall.
Details on the operating principle and assembly of screw discharge systems.
Minimum radius requirement for hoses used with screw discharge.
Operating principle and advantages of the mole discharge system, including assembly.
Specifications for suction and return air hoses for mole discharge.
Method for discharging pellets from a bag silo, including operating principle.
Maximum delivery hose length for bag silo systems and impact on emptying.
Safety requirement for earthing the metal frame of a bag silo.
Process for conveying pellets from underground storage, including operating principle.
Safety procedure for earthing underground tank systems.
Recommended hydraulic diagrams for system integration.
Additional schematic for system integration via an external module.
Information on system adaptation, safety measures, and regulator requirements.