29
The silo is to be set up either in the storage room or in the
boiler room in accordance with the country-specific fire
protection regulations as per the assembly instructions.
The metal frame of the bag silo must be earthed in
accordance with country-specific regulations.
PLANING FOLDER PELLET BOILER
ATTENTION:
Max. Delivery hose length for Biotech pellet sto-
rage system PLS 10 m. Complete emptying of
the PLS cannot be guaranteed, as this depends
heavily on the pellet quality (dust content).
7.6.2 ASSEMBLY 7.6.3 EARTHING OF THE BAG SILO
The pellets are conveyed to the storage tank via the suction hose by a suction probe / auger / mole located in the underground
tank. Filling takes place via the filling coupling attached to the underground tank.
Depending on the manufacturer, dierent sizes of underground tanks are available (e.g. 11,000 litres,...)
Separate the copper strand from the
delivery hose and bend it inwards.
Connect the hose to the extraction
nozzle and place the copper strand
on the metal.
7.7 DISCHARGE FROM THE UNDERGROUND TANK
7.7.1 OPERATING PRINCIPLE
7.7.2 EARTHING OF THE UNDERGROUND TANK
Heating room
Underground tank
Chimney (z.B. Ø130 mm)
NOTE:
For proper installation and connection of
the underground tank, please refer to the
GEOplast manual. This is supplied with
your underground tank.