EasyManua.ls Logo

Bomag BMP 8500 - Checking the Central Screw of the Drive Hub

Bomag BMP 8500
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Every 250 operating hours
BOMAG 75BMP 8500
Fig. 110
l Top up oil through the oil drain hole in the bot-
tom drum.
For quality and quantity of oil refer to the table
of fuels and lubricants.
l Screw the drain and ventilation plugs back in.
5.16 Checking the central screw
of the drive hub
!
Caution
Check the tightening torque of the central
screw on all 4 drive hubs.
Tightening torque: 900 Nm.
Fig. 111
l Check the tightening torque of the central
screw on all 4 drive hubs (Fig. 104).

Table of Contents