Sync Pre-Installation 9
Preliminary Survey
BUILDING CONFIGURATION
Phase and Voltage
QUESTIONS ANSWERS
Pinsetter Sub panel
NOTE: Brunswick Surge Suppressors are required on each GS-pinsetter and scoring sub
panelsfornewinstallations.Allotherinstallationshaveonlyonesurgesuppressoronthe
scorerpanel.
Scoring Sub panel
Existing Equipment
QUESTIONS ANSWERS
Scoring
Bowler’s Console
NOTE: Vectorkeypadbowler’sconsolesarecompatiblewithSync.Vectortouchscreensare
NOTcompatiblewithSync.
Server Model Number
Qua ntity of Clie nts and Model
Numbers
Camera Type
Capping Type
Ball Lift Type
Return Type
Automated Bumper Type
Foul Unit Type
Pinsetter Type
Overhead Type and Size
Masking Unit Type

Table of Contents