8
Publicaon 5423-020-REV 1.0 • www.btxonline.com
The shipping carton in which your ECM 630 Electroporaon
System is packed has been specically designed to provide
maximum protecon to the instrument during transportaon and
normal handling condions. Upon receipt, the carton should be
examined for any external damage resulng from shipment.
Open the carton and carefully remove the ECM 630 System
and inspect the unit for any apparent damage. Save the carton
and packing materials for future transportaon and shipping
requirements.
Packing Data
Check the packing slip to ensure that all items ordered and listed
are included in the shipment. Inform BTX immediately if any parts
are missing or damaged.
Power Source
As received, the instrument is ready for use with either 100–240 V
AC, 50/60 HZ.
The power requirements are 350 was. In the USA, the power
cord has a standard three prong plug.
Installaon
Once you have determined that the components of the system
have not sustained any obvious damage in shipment, proceed
with the installaon.
Remove the insulang tab from the baery at the base of the unit.
Place the generator in a locaon that is a dry, level, sturdy surface
free from extremes in ambient temperature, dust or chemical
exposures. Allow the device to equilibrate to room temperature.
Unpack the safety dome, cuvee rack and disposable cuvee
chambers. Connect the safety dome, specialty electrode, or the
HT plate handler into the connectors at the boom right-hand
side of the front panel.
Connect the mains/power cord to into the back panel at the
boom le.
Power up the system by pushing the rocker switch located on the
back panel at the boom le. The display will ash the BTX logo.
Once the soware inializes, the Main Menu screen will appear.
You are now ready to begin your work.
Main Power Switch
Fuse Holder
Universal Power Input
USB Serial Input Footswitch Input
(switch sold
separately)
High Voltage Output
Touchscreen Display
Unpacking the System
Remove Battery Insulating Tab.