27
Electrical installation
Input type* Terminal Assignment Switch **
Pt 100 ***
(seenote)
9 Processactual3(GND)
Switch
above
10 Process actual 2
(compensation)
11 Process actual 1
(powersupply)
12 Notassigned
* Adjustable via software
(see Operating Instructions type 8692/8693 Rev. 2).
** The switch is situated under the connection cover
(see “Fig. 14: Cable gland connection” ).
Tab. 9: Terminal assignment; process actual value input (for type 8693 only)
*** Forreasonsofwireresistancecompensation,connect
thePt100sensorvia3wires.AlwaysbridgeTerminal
3andTerminal4onthesensor.
11.3.4 Terminal assignment: Operating voltage
Terminal Assignment
On the
device side
External circuit /
signal level
16
Operating
voltage+24V
24VDC±10%
max.residualripple
10%
15
Operating
voltageGND
Tab. 10: Terminal assignment; operating voltage
Whentheoperatingvoltageisapplied,type8692,8693is
operating.
→ Nowmaketherequiredbasicsettingsandadjustmentsfor
thepositioncontroller/processcontroller.Foradescription
seechapter“12Start-up”.
11.3.5 Slide switch position
Supplied Assignment Slide switch position
Internally
supplied
GNDoperating
voltage
Slideswitchbelow
Externally
supplied
GNDisgalvanically
isolatedfromthe
operatingvoltage.
Slideswitchabove
Tab. 11: Slide switch position
ThedescriptionEtherNet/IP,PROFINETandModbus
TCPcanbefoundinchapter“13”.
ThedescriptionoptionbüScanbefoundinchapter“14”.
english
Type 8692, 8693 REV.2