24
4-3 Control panel maintenance :
4-4 Panel wiring instructions :
※Cross tool x 1pcs ※Straight tool x 1pcs
1.Refer to 3-1 Powering off the battery to power off the scooter.
2.Remove the two lock points on the top cover.
3.Use the straight tool to open the control panel.
1.Refer to 3-1 Powering off the battery to power off the scooter.
2.Refer to 4-3 Control panel maintenance: Open the upper control
panel.
3.Open the upper control panel to check the corresponding
connector.
. Main control cable connector
. Buzzer switch connector
. VR initiator controller connector
. Cyclometer transmission wiring connector
B
A
A
B
C
S
C
D
※If you have problems with the control panel, please reconnect the main cable connector
first. If the situation does not change, please replace with a new product immediately.
※The shape and color of different panel connectors differ to prevent improperly connecting
the connectors; please do not modify the connector or circuit, which may cause serious
problems.
※For issues related to the electrical parts of the scooter, it is recommended to first check
the above connectors to confirm whether they have loosened to cause the abnormality.