27
detection operation will not be  affected. Press NEXT  when the airflow
verification check is complete.
If  the  system  has  an  indoor  unit  equipped  with  an  updated-version
CFM-controlled  blower  system  (typically  found  in  equipment
manufactured  after  November  2017),  the  screen  will  display  the  static
pressure  (in  inches)  across  the  equipment  at  a  pre-determined  target
airflow  CFM.  If  the achieved  (actual)  CFM  is  unacceptably  below  the
target  CFM,  a  yellow  notice  will  appear  to  invite  the  user  to  see  the
associated information screen; equipment operation and the TrueSense™
dirty filter detection operation will not be affected. Press NEXT when the
airflow verification check is complete.
NOTE:  The  airflow  verification  check  occurs  at  initial  installation,  or
when  FULL  INSTALLATION  or  AIRFLOW  VERIFICATION
TEST are selected in the INSTALLATION & SERVICE menu.
5.12.   Duct Assessment (zoned systems only)
The  duct  assessment  screen  will  be  displayed  next  for  zoned  systems.
Touch NEXT to start  Duct Assessment. Duct Assessment will measure
the relative size of the ductwork, up to and through the dampers. These
measurements  are used  to control  the  correct  amount of  airflow  in the
zoned system. Status messages will appear on the screen to indicate what
the system is doing. The process will take approximately two minutes per
zone. The duct assessment will override a call for heat or cool.
A duct assessment will automatically occur each day at a user selectable
time.  The  factory  default  time  is  1:00  p.m.  local  time  but,  may  be
changed by entering the Zoning Setup menu. If there is an active call for
heating or cooling, the system will wait until the call is satisfied before it
performs the duct assessment. The system will first open all zones and
drive  the  blower  to  175  CFM/ton  of  cooling  (or  the  minimum  indoor
unit’s  airflow,  whichever  is  greater).  It  will  then  take  a  static  pressure