Send document comments to nexus7k-docfeedback@cisco.com
E-15
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-06
Appendix E      Repacking the Cisco Nexus 7000 Series Switch for Shipment
Repacking the System Components
Figure E-5 Packing a 6-kW DC Power Supply Unit in a Single-Unit Box
b.
Fold the trifold cover at its seams and place it over the coiled power cables (see Callout 2 in 
Figure E-5).
c. Loosen the four captive screws on the power supply unit so that they no longer connect with the 
chassis.
1 Coil the power cables and place them on the 
bottom of the opened box.
6 Place the padded power supply unit inside the 
box and on top of the trifold.
2 Place the trifold cover over the coiled cables.  7 Fold the narrow flaps over the power supply 
unit pads.
3 Place the power supply unit in its ESD bag 
and hold the filler box outside the bag in the 
notched portion of the power supply unit.
8 Fold the wide flaps over the power supply 
unit.
4 Place the nonexpanding end pad over the back 
end of the power supply unit and filler box.
9 Tape the wide flaps together and to the box 
with packing tape.
5 Pull the two sides of the expandable end pad 
apart, fit the end pad over the front of the 
power supply unit, and press the two sides 
together snuggly over the front of the power 
supply unit.