MACHINE PREPARATION
1. HANDLING OF THE PACKED MACHINE
The machine is contained within specific packaging.
It is not possible to place more than two packages on top of each other.
The overall dimensions of the package are:
ABILA 2010
A 1145mm
B 665mm
C 1230mm
C
B
2. HOW TO UNPACK THE MACHINE
1. Remove the outer packaging
2. Disengage the parking brake, by means of the lever on the left wheel of the machine (1)
3. The machine is secured to the pallet with wedges that lock the wheels, remove these wedges (2)
4. Use a chute to get the machine down from the pallet, pushing it backwards. Do not assemble the
rear squeegee before unloading the machine, and avoid violently jolting the brush head.
5. Keep the pallet for any future transport needs
ATTENTION: if the product is delivered in cardboard containers, handle the
packed product with suitable lifting means that comply with the legal
requirements
3. HOW TO MOVE THE MACHINE
1. To safely move the machine, you should use a pallet to support it (positioning wooden wedges to
block the wheels, as shown in the previous paragraph).
2. Lower the squeegee by means of the lever at the rear of the machine. To assemble the
squeegee, read the “ASSEMBLING THE SQUEEGEE” paragraph
3. Lower the brush head allowing the brushes to rest by means of the lever on the right rear of the
machine.
4. Stop the machine by operating the brake lever located behind the left wheel of the machine.
1
2