3
Installa tion
Connecting Material Lines for
Self-Loading (Optional) (continued)
4 Attach the air conveying line to
the outlet of the hopper loader.
Secure with clamp.
5 Connect the air conveying line
to the inlet of the pneumatic
valve located on the side of the
dryer frame. Secure with clamp.
Installa tion l 3-9