Operati on l 4-39
Using the The Self-loading
Function on the Hopper Loader
(Optional)
1 Connect the conveying hose and/or pick-up wand from the material source
to the inlet on the hopper loader.
2 Connect a clean, dry compressed air source supplying 80 psi of compressed
air to the threaded coupling on the side of the MDCW dryer.
3 Set the “hopper loader load time” (see Page 4-13 , screen 7), or “hopper ldr
virgin and regrind” (if you are using the ratio loading option) (see Page 4-13,
screens 8 , 9 and 10) to the desired values.
4 Adjust the hose connection on the pick-up wand to cover the number of
holes to maximize the material flow.
5 Turn the “hopper loader” switch to the ON position.
4
Operation