Maintenanc e l 5-3
5
Maintenance
Preventative Maintenance
Checklist
(continued)
• Ever y six months or as needed.
❒
Inspect gaskets for damage or wear.
Damaged gaskets can allow moisture to seep into the closed-loop drying
system. Replace any gasket that is torn or cracked.
❒
Verify dewpoint readout and performance with calibrated portable
instrument.
❒
Measure current draw on all 3 legs of heater wires. This is to ensure
that the heater is working properly.
❒
Examine the bolts.
Examine the bolts or clips holding the loader to the surface. Make sure
the bolts or clips are tight.*
*Procedures marked with an asterisk are steps to follow for the receiver located on top of the
hopper.